|
Product Details:
|
Material: | Q235 | Weight: | 2.35kg |
---|---|---|---|
Heat Treatment: | Depends On Customers | Usage: | Fasten The Concrete Forms |
Color: | Original Color, Galvanized Color | Process: | Sand Casting |
High Light: | Beam Wedge Lock Clamp,Sand Casting Wedge Lock Clamp,Concrete Forms Wedge Lock Clamp |
Russian Panel Formwork Wall Wedge Clamp Lock For Beam
◆Product Overview
Formwork clamps can work well as a fasterner during assembling process and its recycling use can down the construction cost.
A fast and effective method for securing wire tie rods in light formwork applications. The tension tool is used to pull the wire tie bar through the clamp.
Application:It’s used in fixing column formwork in construction site.
Installation:
First step, join the 4 piece of panel by slots at edge of panel, fix the corner of column formwork by adjustable corner clamp and keep the clamp the same height.
Second step, put the column clamp on the corner clamp, the head of column clamp is fixed into the bent end of column clamp, make sure the column clamp is faced with beam tightly.
Finally, put the wedge pin into column clamp, fix it by hammer, measure the distance between column clamp and keep the clamp the same height, install the resting panel and column clamp by the installation steps.
Dismantling:Hit the end of wedge pin by hammer, remove the steel plate by hands.
Packing&Shipping:
Regarding the package,We use wooden case or wooden pallet or metal case or as customers' request.
All our formwork accessories are made as per European standard,and all our customers are very happy with our quality.Quality is our company's life.
◆Product Parameter
Formwork clamptypes | Formwork wedge panel clamp |
Sample | |
Material | Q235 |
Weight | 2.9KG |
Surface treatment | Natural ,Painted, Electro galvanized |
Colour | self color (black), silver galvanized or colorful galvanized |
Process | Sand casting |
◆Product Advantage
1.Adopt advanced steel craft,good quality assurance
2.Various shapes,customized or OEM is available
3.Made of excellant casteed iron material,high strength
4.Different size,match formwork panels of various size
5.Fast installation, two workers install a 4m column within 12 minutes
Contact Person: Sunny
Tel: 13731704301