Product Details:
|
Product Name: | Column Galvanized Adjustable Formwork Beam Panel Clamp Scaffolding Replacement Parts | Heat Treatment: | Depends On Customers |
---|---|---|---|
Usage: | Connects Panels | Weight: | 3.55kg |
Surface Treatment: | Galvanized Or Painted | Colour: | Silver Galvanized Or Colorful Galvanized |
Process: | Drop Forged, Pressing | Transport Package: | Wooden Case Or Iron Case Or Pallet |
Application: | Template Building | Delivery Time: | 20days-35days |
High Light: | 3.55kg formwork clamp,cma formwork clamp,cma scaffolding replacement parts |
Column Galvanized Adjustable Formwork Beam Panel Clamp Scaffolding Replacement Parts
◆Formwork Beam Panel Clamp Product Overview
The Formwork Clamp ensures neat panel joints resulting in perfect concrete finishes.With only one component, every panel connection is flush, aligned and tight.The Formwork Clamp guarantees strong joints and fast assembly of the panels.This is the main component used to join formwork panels. With one single strike of the hammer, it can be used to make panel connections tight joint, no any concrete leak.The Formwork Clamp ensures a flexurally stiff connection of panels and allows large units to be moved.
◆Formwork Beam Panel Clamp Product Parameter
Item | Steel Pressed Formowork Rapid Spring Clamp for Concrete Formwork Construction | Rapid Clamp Tensioner | Rapid Clamp Tensioner | ||
Photo | ![]() |
![]() |
![]() |
![]() |
![]() |
Material | Carbon steel | Carbon steel | Carbon steel | Carbon steel | Carbon steel |
Size |
70*105mm*3mm, 75*110mm*3.75mm, etc. |
70*105mm*3mm, 75*110mm*3.75mm, etc. |
75*105mm*3mm | / | / |
Weight | 310g, 420g,etc. | 310g, 420g,etc. | 380g/pc | 2.9kg/pc | 3.2kg/pc |
Finishing | Glavanizing | Painted, Powder Coated | Galvanizing | Galvanizing |
Galvanizing, Powder Coated |
Package |
50pcs/bag or box; then put in ton bag or pallet |
50pcs/bag or box; then put in ton bag or on pallet |
50pcs/bag or box; then put in ton bag or on pallet |
4pcs/box | 4pcs/box |
◆Formwork Beam Panel Clamp Product Advantage
1. Construction Concrete Formwork Clamp is made by High Strength Metal Material or steel by casting ,forged or pressed,they are Inserted in to Fixed Formwork Walers and Double Profiles during concrete form works.
◆Formwork Beam Panel Clamp Packing&Shipping
Regarding the package,We use wooden case or wooden pallet or metal case or as customers' request.
we have been supplying and exporting the formwork accessories since year 2008,All our formwork accessories are made as per European standard,and all our customers are very happy with our quality.Quality is our company's life.
For more details, just click here to download product catalog
Contact Person: Sunny
Tel: 13731704301